The train is doing decent as it is newly introduced. Major pain points to be worked on to further improve.
1. Revise TT in both directions. 6:00 DEP from RNC and 22:00 ARR RNC . Public transport is a big challenges at current DEP and ARR
2. GMO and PNME halts required as GMO can pull pax from DHN and PNME being a...
more... major Jain pilgrim site will help
3. Cut down the slack to speed up RNC-BKSC section. It is arriving daily BT at BKSC and stands for 15-20 mins.
Not everyone is doing KV darshan daily, so IR needs to make it pax friendly with better speed and time to cater larger audience. It is definitely doing better than many VB which were launched.
please wait...Translate to EnglishThe train is doing pretty good for something new. But there are some big issues that need fixing to make it even better.
1. Change the timings going to and from RNC. Leaving at 6:00 from RNC and arriving at 22:00 at RNC is causing problems with public transport at those times.
2. We need stops at GMO and PNME. The train at GMO can attract passengers from DHN, and stopping at PNME, a Jain pilgrimage site, will be a big help.
3. We gotta speed up the RNC-BKSC route by cutting out the delays. It's always late at BKSC, standing around for 15-20 mins every day.
Not everyone is checking out the KV daily, so the railway needs to make it more passenger-friendly with faster speeds and better timing for a bigger crowd. It's definitely doing better than other trains that started running recently.